Following this weekend's matches, the area surrounding the football pitch will be prepared, including the stands, irrigation system, and grass.
The solution adopted for the improvements is based on the use of gabion walls. This will shorten the construction time and allow for a design that blends seamlessly into the landscape. The irrigation system and the turf of the football field will also be replaced, and a perimeter walkway will be created to allow spectators to watch the matches from the promenade alongside the road.
These operations will improve accessibility to the facilities and enhance the overall landscape integration.
The works involve an investment of €290.555,85.








